I The 'new NAFTA' – introduction to NAFTA and USMCA

After multiple rounds of negotiation, and years of speculation and discussion about the fate of the North American Free Trade Agreement (NAFTA), a revised North American trade pact, known in the United States as the United States–Mexico–Canada Agreement (USMCA), was signed by former US President Donald Trump, then Mexican President Enrique Peña Nieto and Canadian Prime Minister Justin Trudeau on 30 November 2018 to replace NAFTA, originally executed in 1994. This new trade agreement was modified on 10 December 2019 through a protocol of amendment agreed by the three countries. The amended USMCA was ratified by Mexico in June 2019, the US in early 2020 and by Canada on 13 March 2020 (immediately before Canada's parliament suspended itself for six weeks because of the novel coronavirus). On 24 April 2020, US Trade Representative Robert Lighthizer notified Congress that Canada and Mexico have taken all measures necessary to comply with their commitments, and that the Agreement entered into force on 1 July 2020.

The now abandoned NAFTA, born with popularity as well as controversy, was initially negotiated by the governments of the United States, Canada and Mexico in an effort to liberalise trade by eliminating tariffs on products traded between and among these three countries. NAFTA also offered other innovations, including cross-border intellectual property protection and a dispute resolution mechanism under which private investors from one of the Member States were permitted to bring claims directly against one of the other Member States. The idea was to create greater trade opportunities, broader protection for investors and innovative mechanisms to create the world's largest international free trade zone. In fact, NAFTA helped contribute to a tremendous increase in trade among the United States, Canada and Mexico, and substantially reshaped North American economic relations. Apart from its economic contributions to both regional and world economy, NAFTA also played a significant role in foreign relations and in promoting political stability within the region.

However, NAFTA was a perennial target for former President Trump, who described it as 'the worst trade deal ever'.2 Soon after his election, he proposed the renegotiation of NAFTA to Congress as part of his plan to reduce the trade deficit. After more than a year of negotiation, a new agreement, USMCA, was signed. It addressed some of the major concerns of certain constituents arising from NAFTA.

Although USMCA and NAFTA contain many similarities, there also are important changes. For example, USMCA expands intellectual property protection and adjusts treatments on important industries, such as automobile and agriculture. Perhaps the most significant change relates to the investment dispute resolution mechanism available under USMCA. Although the substantive protections for foreign investments in USMCA Chapter 14 largely mirror those contained in NAFTA Chapter 11, the scope of investor–state dispute settlement (ISDS) is reduced considerably. Additionally, in a significant departure from NAFTA, Canada has not agreed to the investment arbitration mechanism. This means that neither US nor Mexican investors will be able to bring claims against Canada under USMCA, nor will Canadian investors be entitled to bring such claims against Mexico or the United States. Other important changes to the substance of investment protections contained in USMCA as compared with NAFTA will be discussed in more detail in Section III.

USMCA has been ratified by Mexico and the United States and, most recently, Canada. Investors therefore should be aware of potential legacy rights under NAFTA and of the significant changes USMCA introduces.

ii USMCA ratification

i The process in the United States

In the United States, the President has the authority to negotiate trade agreements without interference, but members of Congress have the power to vote on trade promotion agreements without amendment.

Under normal 'fast-track' procedures for trade agreements, a simple majority vote is needed in the House of Representatives (within 60 session days), followed by a simple majority vote in the Senate within 30 session days thereafter to approve or refuse a trade agreement. Before the final text of the agreement is introduced to Congress, a report describing the required changes to US law drafted by the US Trade Representative (USTR) and a study on the agreement's economic impact drafted by the International Trade Commission (ITC) also are to be provided to Congress.

With regard to USMCA, the USTR report was submitted to Congress by Representative Lighthizer in February 2019. The ITC's impact study was issued on 18 April 2019, delayed because of the 35-day government shutdown in early 2019. In June 2019, Nancy Pelosi, the Speaker of the House, appointed various representatives to negotiate several amendments to the USMCA with the Trump administration. This negotiation concluded with a revised USMCA text that all three Member States adopted as a protocol of amendment to USMCA on 10 December 2019.

On 13 December 2019, the Trump administration submitted the proposed USMCA implementing legislation to Congress, and the House of Representatives approved it on 19 December 2019.3 The USMCA implementing legislation was approved by the Senate Finance Committee on 7 January 2020, and the Senate approved the implementing legislation on 16 January 2020.

The final step was for former President Trump to sign the implementation bill into law for the ratification of USMCA in the United States, which he did on 29 January 2020. As all of the steps necessary to implement the new trade agreement in the US were completed, and because Mexico and Canada both ratified the agreement, and all three countries certified their preparedness (with the US having done so on 24 April 2020), USMCA took the place of NAFTA and became the new law in the US governing the commercial relationships between the United States, Mexico and Canada on 1 July 2020.4

ii The process in Canada

In Canada, domestic ratification of a treaty like USMCA (called the Canada–United States–Mexico Agreement or CUSMA in Canada) lies in the hands of Parliament. Finalising the implementing legislation was delayed because the Liberal party lost the majority in Parliament in October 2019. The House of Commons ratified USMCA on 13 March 2020 and Governor General Julie Payette signed it shortly thereafter.5

Typically, the ratification process in Canada contemplates that, after signature, the new agreement, along with an explanatory memorandum, is tabled in the House of Commons for debate. If there is sufficient support in the House of Commons, it proposes a motion to recommend action within 21 sitting days, including ratification of the agreement. A vote is not required. The cabinet exercises full control over the ratification process. It is empowered to authorise the Minister of Foreign Affairs to sign an Instrument of Ratification. Then, an implementing bill, which contains the changes required to Canadian law at the national level, is tabled and debated in the House of Commons and Senate, respectively. Members of Parliament may suggest changes to the implementing laws and ask questions of the government, but they cannot change the substance of the new agreement. In this instance, given the 'extraordinary circumstances' presented by the novel coronavirus, the third and final reading of USMCA was deemed approved without a recorded vote as part of an omnibus adjournment motion unanimously approved by the members present. Canada certified its preparedness to implement the Agreement on 2 April 2020.

iii The process in Mexico

The ratification process in Mexico is simpler than that of the United States and Canada. It contemplates that, after signature, the new agreement is sent to the Senate for a vote. On 19 June 2019, the Mexican Senate approved the implementing legislation for USMCA on a simple majority vote and thereafter was published and entered into force. On 12 December 2019, Mexico approved the amendments to USMCA, becoming the first country to ratify USMCA and its amendment. Mexico certified its preparedness to implement the Agreement on 2 April 2020.

iv Concluding thoughts regarding ratification

Even though USMCA has entered into force, investors with 'legacy investments'6 still have a three-year period to bring a dispute under NAFTA,7 even though NAFTA will terminate upon entry into force of USMCA, three months after the Member States have all ratified it.8 Investors with potential claims concerning legacy investments will want to take all necessary preliminary steps and submit a formal notice of arbitration no later than three years after USMCA enters into force (or July 2023) to avoid risks and uncertainties caused by the transition. Investors who establish investments after the entering into force of USMCA will not be able to bring claims under NAFTA.

iii Most significant differences between USMCA and NAFTA

i Dispute resolution mechanism9

Compared with NAFTA, some of the biggest changes in USMCA are set forth in its Chapter 14. Perhaps the biggest change is that Canada has not signed on to Annex 14-D (US–Mexican investment disputes) or Annex 14-E (covered government contracts). As a result, other than for legacy investments and pending claims under Annex 14-C, neither US nor Mexican investors can bring arbitration claims against Canada under USMCA, nor can Canadian investors bring such claims against the United States or Mexico. Canadian investors in Mexico and Mexican investors in Canada, however, have access to investment arbitration under the Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP), which entered into force in December 2018. However, the application of ISDS in CPTPP Chapter 9 is not as broad as in NAFTA. For example, Mexico has carved out its consent to investment arbitration under the CPTPP with respect to government contracts-related infrastructure projects.10

USMCA also contains numerous changes to the availability and terms of ISDS for claims against Mexico (by US investors) or the United States (by Mexican investors). The four most significant changes relate to the restriction of covered claims under Article 14.6, the requirement to exhaust local remedies under Article 5 of Annex 14-D, the definition of 'investment' under Article 14.1 and the definition of 'claimant' under Article 1 of Annex 14-D.

First, USMCA limits the types of claims that can be brought in arbitration as compared with NAFTA. Two of the most common claims under NAFTA, for indirect expropriation or for a breach of the minimum standard of treatment, are no longer covered under the new agreement.11 Nonetheless, investors who enter into government contracts related to oil and natural gas, power generation, telecommunications, transportation services, or ownership or management of infrastructure, are exempted from those changes (in part) and offered a broader set of ISDS protections.12 Additionally, USMCA limits the scope of 'fair and equitable treatment' and 'full protection and security' by giving these terms specific definitions under minimum standard of treatment.13 Moreover, Annexes 14-D and 14-E provide that the Most-Favoured-Nation (MFN) clause (Article 14.5) cannot be used to import substantive or arbitration provisions from other treaties.14 This change is unprecedented – no other investment treaty explicitly restricts an MFN clause in this way.15

Second, the new procedural requirements in USMCA create additional burdens for investors. They must pursue national court proceedings to completion or for at least 30 months before submitting claims to arbitration under USMCA, unless they can demonstrate that this would be 'obviously futile'.16 Meanwhile, the four-year overall time limit for bringing claims from the date on which the investor first acquired, or should have acquired, knowledge of the alleged breach includes the 30 months that must be spent before the domestic courts. This means that, in practice, investors who plan to bring claims under USMCA will need to watch the calendar very carefully and consider preparing a notice of claim even before or while national proceedings are pending. In what has been described as an 'asymmetrical fork-in-the-road provision',17 a US investor may not bring to arbitration a claim for a breach of USMCA, as distinguished from a breach of other obligations under Mexican law, that the investor previously has submitted to national court proceedings or an administrative tribunal of Mexico.18 Although this provision has not been tested in practice, this seems to suggest that US investors who intend to bring claims for violation of USMCA need not exhaust domestic remedies and, in fact, would waive their right to arbitrate in doing so.19 The procedural requirement of going to national courts or administrative tribunals before arbitration also does not apply to an investor who is a party to certain government contracts, as mentioned above. And, the overall time limit of claims involving such government contracts is three years instead of four.20

Finally, certain clarifications were made in USMCA to the definition of 'investment', and 'claimant' was added as a new term (which modifies the definition of 'investor').

Under Article 1139 of NAFTA, investment is defined by a finite list of 10 examples, which include 'an enterprise', 'credit security' and 'debt security' in an enterprise, a 'loan . . . [or] interest in an enterprise', 'real estate or other property, tangible or intangible' and 'claims to money'. In contrast, Article 14.1 of USMCA defines investment more broadly, and like many other investment treaties (including more modern US free trade agreements), as 'every asset that an investor owns or controls, directly or indirectly, that has the characteristics of an investment, including such characteristics as the commitment of capital or other resources, the expectation of gain or profit, or the assumption of risk'.21 This general definition is followed by an open list of examples, which includes an express exclusion only for 'an order or judgment entered in a judicial or administrative action' or 'claims to money that arise solely from commercial contracts for the sale of goods or services', and related extensions of credit. It is unclear whether this change to the definition of investment will be interpreted in a different and more expansive way than investments under Article 1139 of NAFTA.

Under Article 1 of Annex 14-D of USMCA, claimant is defined as 'an investor of an Annex Party [i.e., the United States or Mexico] that is a party to a qualifying investment dispute, excluding an investor that is owned or controlled by a person of a non-Annex Party that, on the date of signature of this Agreement, the other Annex Party has determined to be a non-market economy for purposes of its trade remedy laws and with which no Party has a free trade agreement'.22 This restriction is new. Though both NAFTA (in Article 1113) and USMCA (in Article 14.14) already contain denial of benefits clauses, those clauses only allow a respondent state to deny the benefits of the investment chapter, including access to ISDS, to an enterprise of another party that is owned or controlled by third-state nationals and that has no substantial business activities in the territory of the party in which it is incorporated. The new exclusion of US or Mexican claimants owned or controlled by a national or enterprise of a non-market economy is broader because it excludes a potential claimant from arbitration even if the US or Mexican company engages in substantial business activities in its state of incorporation.

When NAFTA was initiated, private investors' wide range of rights were strongly supported by the United States and Canada to obtain the maximum protection against what was perceived to be 'Mexican nationalism'.23 It seems the tides have turned and that there is a greater emphasis in USMCA on the Member States' sovereign right to regulate public policy, especially with respect to environmental regulation.

ii Arbitral proceedings

In addition to the changes described above, USMCA contains additional changes that appear to be focused on streamlining arbitral proceedings and making them more transparent. Whether the changes will lead to a more effective, efficient and fair dispute settlement system remains to be seen.

USMCA includes new provisions intended to increase the transparency of arbitral proceedings by explicitly providing that the public have access to relevant arbitration documents and the hearings,24 whereas NAFTA contained provisions relating to publication of the award, and of the notice and request for arbitration.25 In practice, many of the written submissions, awards and other documents relating to NAFTA cases have been made publicly available (at least in redacted form) already such that this provision may have little practical effect.

USMCA contains new requirements to prevent 'double-hatting'. Annex 14-D provides that arbitrators must comply with the International Bar Association Guidelines on Conflicts of Interest and are prohibited from acting as 'counsel or as party-appointed expert or witness in any pending arbitration under the annexes to this Chapter' for the duration of the proceedings.26 Given the already relatively small pool of arbitrators with investment arbitration experience, this change will further limit the available pool of arbitrators, but also may help to avoid a perception that arbitrators could be involved as counsel in a dispute with related issues and therefore have an underlying if indirect conflict of interest.

In contrast with the NAFTA requirement that the arbitration be seated in a NAFTA state, USMCA allows the tribunal to choose the place of arbitration in any state that is a party to the New York Convention.27 As the seat of arbitration can influence the proceedings in many ways, from the commencement of arbitration to the annulment of a final award, more choice over the seat of arbitration could introduce more flexibility, but will also require the parties to be on guard and ensure they provide input to ensure selection of a seat strategically best suited to the dispute at issue.

Another new feature of USMCA is that the disputing parties are given the right to review and comment on the tribunal's award on liability prior to its issuance.28 Again, it remains to be seen how this innovation will play out in practice and whether it will simply lead to a never-ending circle of post-hearing and pre-final award briefings.

USMCA also provides an expedited hearing procedure for certain objections; for example, jurisdictional objections and objections that a claim is manifestly without legal merit.29 Again, whether these changes will lead to more efficient or just more expensive and drawn-out proceedings remains to be seen; much will depend on arbitrators' willingness to kick out claims at the jurisdictional stage.

iii Investment fields

Apart from the dispute resolution mechanism, changes were also made in several investment fields.

Auto industry

Significant changes were made to provisions relating to rules of origin and minimum wages. While NAFTA requires only 62.5 per cent of cars produced in the trade zone to be made in North America, the new agreement increases the percentage to 75 per cent.30 A new requirement on minimum wages was added in USMCA, which provides that at least 40 per cent of automobile parts have to be made by workers who earn at least US$16 an hour by 2023.31 The change was intended to encourage the signing countries to enhance their labour protections, particularly in Mexico. In addition, the amended USMCA added a requirement that 70 per cent of a vehicle's steel and aluminum must originate in North America to receive duty-free benefits.32 For steel to be considered as originating in North America, the melting and pouring of this metal must occur in this region. However, this provision only begins seven years after the USMCA enters into force.33

Agriculture

USMCA creates new market access opportunities for US exports to Canada of dairy, poultry and eggs. In return, the United States will provide new access to Canada for dairy, peanuts, processed peanut products, and a limited amount of sugar and sugar-containing products. The most significant change was made relating to the dairy industry, where the Unites States will be able to export to Canada the equivalent of 3.6 per cent of Canada's dairy market, up from the existing level of about 1 per cent.34 Additionally, USMCA changes market access, sale and distribution regulations, relating to wine and other alcoholic beverages in a significant win for US wine and other alcohol exporters.

Intellectual property rights

Generally, as compared with NAFTA, USMCA offers broader protection in respect of intellectual property rights. Although NAFTA offers statutory protection for intellectual property rights, USMCA contains clarified definitions and stronger language. These changes appear to offer a wider range of protection in respect of addressing digital trade,35 expanding the scope of intellectual property rights and enhancing the remedies for infringement. The deal also established a copyright protection period of 70 years after the author's death,36 increasing Canada's current protection period of 50 years.

Procurement

Although the public procurement provisions between the United States and Mexico essentially stay the same, Canada is excluded from the procurement chapter37 in USMCA. Instead, Canada's relationship with the United States regarding procurement would be governed by the World Trade Organization Agreement on Government Procurement (GPA); and, procurement as it relates to Canada and Mexico would be governed by the CPTPP.

The exclusion of Canada from the procurement chapter of USMCA is not expected to have a significant impact as between the United States and Mexico, or Mexico and Canada. However, it may slightly reduce US companies' access to procurement in Canada as the procurement thresholds for goods and services in Canada under NAFTA will no longer apply.38 Also, while under NAFTA, all services except for those Canada lists as excluded in NAFTA are available for procurement;39 GPA provides a narrower list of services.40 This difference in the scope of applicable services may reduce US companies' access to procurement opportunities in Canada as well.

US national security tariffs

During negotiation, Mexico and Canada asked the United States to lift its national security tariffs on steel and aluminum under Section 232 of the 1962 Trade Expansion Act. But USMCA does not mention this protection. Instead, the Unites States reached two separate side agreements with Mexico and Canada respectively to reduce national security tariffs on automobiles and automobile parts.41 Under these agreements, 2.6 million passenger vehicles and US$32.4 billion in auto parts from Canada will be exempt from duties. For Mexico, 2.6 million passenger vehicles will also be exempt, as well as US$108 billion in auto parts.42

Labour

The amended version of USMCA released in December 2019 created a new 'rapid response' mechanism to resolve labour dispute issues between the member countries. Once a complaint is made, the host country has the opportunity to take action and investigate the allegation. If no action is taken, a panel of experts may be sent to the facility at issue to determine if a labour violation has occurred. A list of panelists will be maintained by the Member States and renewed every four years. Despite the detail of this mechanism outlined in the amended USMCA, there is little information on how this mechanism will be implemented. It remains unclear the specific activities the panel will perform once a labour issue arises and a panel is sent to a facility.43 This mechanism has been established for disputes between the US and Mexico and between Canada and Mexico, but not between the US and Canada as it was intended principally to address Mexican labour concerns.44

Sunset clause

Unlike NAFTA, a sunset clause was included in Chapter 34 of USMCA. The Member States settled on a 16-year expiry term. Every six years, the United States, Mexico and Canada will conduct a joint review and decide whether to extend the term of the agreement for another 16-year period.45

iv Status of current claims under NAFTA chapter 11

Although various US constituents have expressed significant concerns about and opposition to the NAFTA dispute resolution mechanism, it is notable that the United States has not lost in a single investor–state case as a respondent. However, US (and other) investors have benefited from NAFTA protections.

Approximately 102 known disputes have been initiated under Chapter 11 of NAFTA. While about half of the claims were brought against Canada, only 22 claims have been brought against the United States and approximately 35 claims have been brought against Mexico. Among the cases that went through to a final award on the merits, Canada and Mexico lost six and five cases, respectively, while the United States lost none. Eleven of the 22 claims filed against the United States were dismissed by the arbitrators, and the remainder were either settled without damages (one case), withdrawn (two cases) or are inactive (seven cases).46 One recently was filed and is pending.

Although USMCA contains several substantial changes to NAFTA, there are approximately 23 claims pending under NAFTA that should not be affected by the coming into force of USMCA.47 One known legacy claim has been filed to date. Information about available details and status of each of these claims is set forth in the table in the Appendix to this chapter.

Of these claims, one prominent NAFTA claim is notable in light of recent court litigation that may cause the NAFTA arbitration to be (re)activated. In 2016, a Canadian company, TransCanada PipeLines Ltd, brought claims for US$15 billion against the United States.48 TransCanada alleged that the delay and eventual rejection by the Obama administration of the Keystone XL pipeline discriminated against the company, denied it fair and equitable treatment, and expropriated its investment under NAFTA Chapter 11. After the Trump administration approved the project, the investor and the US government agreed to discontinue the NAFTA claims. In March 2017, the ICSID Secretary-General formally discontinued the arbitral proceedings. In November 2018, in response to a lawsuit brought by environmental and Native American groups against the US Department of State and TransCanada, a federal court in Montana ordered a pause in the construction of the Keystone XL pipeline. The 9th Circuit dismissed the suit as moot after President Trump issued a new permit for the project in 2019. Various other lawsuits have been filed concerning the matter, some of which remain pending. On 21 January 2021, President Biden formally revoked the permit needed to build the Keystone XL pipeline. The filing of a legacy NAFTA claim as well as other legal options apparently are being considered. The legacy NAFTA claim provision was invoked for the first time in the Koch v. Canada arbitration and a further claim between Canadian company Northern Dynasty Materials and the US has also been discussed as a possibility.

v Recommendations for investors

The ISDS arbitration provisions in USMCA represent a significant departure from those in NAFTA. US and Mexican investors in Canada will be unable to bring claims against Canada under USMCA, and Canadian investors also will be prevented from bringing such claims against the United States or Mexico. US and Mexican claimants also will have fewer potential grounds for claims, except where they are relying on a government contract in a covered sector, and will be required to comply with domestic litigation requirements (under certain circumstances) before commencing arbitration.

The full impact of the changes in USMCA remains to be seen, particularly because legacy NAFTA claims can still be filed.

For those who have NAFTA claims pending, the transition from NAFTA to USMCA will likely not have an impact on the ongoing procedure. The NAFTA dispute resolution mechanism will still be in place until the end of the dispute. This may not be the case, however, if a case relating to a legacy investment is annulled and later resubmitted if the resubmission occurs more than three years after NAFTA was terminated.

Investors with legacy investments who have potential claims and want to take advantage of the NAFTA dispute settlement mechanism will want to submit a formal notice of arbitration no later than two years and nine months after the entry into force of USMCA. That is because legacy investment claims must be brought within three years after NAFTA was terminated; NAFTA contains a (minimum) 90-day notice provision, so investors will want to closely watch the clock and submit their claims in good time. That clock, which started to tick and will elapse 90 days after Canada ratified USMCA and all countries have certified preparedness to implement the Agreement (or 1 July 2020). Because of the 90-day notice provision, investors are out of time already for any investments that do not relate to 'legacy' claims. In any event, investors will want to submit any legacy NAFTA claims as soon as possible and no later than 90 days before 13 March 2023, when the sunset clause elapses.

For investors who intend to establish or acquire investments after the entry into force of USMCA, special consideration should be given to address how to avoid or resolve potential conflicts when drafting agreements with government entities. NAFTA remedies are no longer be available and USMCA does not provide investors the same broad rights to initiate arbitration directly against the Member States. As a result, investors will want to include in such agreements clear and unambiguous language concerning their dispute resolution rights, including, if applicable, the right to resort to arbitration.

In spite of the fact that USMCA has narrowed the scope of available procedure and remedies in the dispute resolution context, the progress made in other areas could provide certain benefits. For instance, the inclusion of broader intellectual property protections and new market access may prove more favourable.

Although former President Trump has described USMCA as 'the largest, most significant, modern and balanced trade agreement in history',49 the real impact of USMCA remains to be seen. Given USMCA's limitations, beyond considering whether they should bring claims relating to legacy investments now rather than waiting until the sunset clause elapses, investors should evaluate other potential means of protecting their investments in the Member States beyond those contained explicitly in USMCA. In any event, investors should consider all available options to protect their current and future rights.

APPENDIX: NAFTA CHAPTER 11 CLAIMS

The table below is drawn in part from Scott Sinclair, Trade and Investment Research Project, Canada Center for Policy Alternatives and builds on a prior version of this table reproduced in the 4th and 5th editions of the Investment Treaty Arbitration Review.

Case and date Issue Status Arbitration information
Amtrade International v. Mexico Notice of Intent submitted on 21 April 1995 Claim of discrimination in violation of prior settlement agreement. Damages sought: US$20 million. Arbitration never commenced. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Halchette Corp. v. Mexico Notice of Intent submitted in August 1995 Dispute over airport concession. Damages sought: unavailable. Notice of intent is not public. Arbitration never commenced. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Signa SA v. Canada Notice of Intent submitted on 4 March 1996 The investor alleged Canada expropriated its investment and violated the minimum standard of treatment. Damages sought: C$50 million. Notice of intent was withdrawn by investor. Arbitration never commenced. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Ethyl Corporation v. Canada, ad hoc (UNCITRAL) Notice of Intent submitted on 10 September 1996 Challenge to ban on import and interprovincial trade of gasoline additive MMT. Damages sought: US$201 million. After preliminary tribunal judgments against Canada, Canadian government repealed the MMT ban, issuedan apology to the company and settled out-of-court with Ethyl for US$13 million. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Karl-Heinz Böckstiegel (President), Charles N Brower (appointed by claimant), Marc Lalonde (appointed by respondent)
Sun Belt Water, Inc v. Canada Notice of Intent submitted on 27 November 1998 Challenge to water protection legislation and moratorium on exports of bulk water. Damages sought: US$10.5 billion. Arbitration never commenced. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Metalclad Corp v. Mexico, ICSID Case No. ARB(AF)/97/1 Notice of Intent submitted on 2 October 1996 US waste management company challenged decisions by a Mexican local government to refuse it a permit to operate a hazardous waste treatment facility and landfill site. Damages sought: US$90 million. In August 2000, the tribunal ruled that Mexico's failure to grant the investor a municipal permit and the state decree declaring the area an ecological zone was 'tantamount to expropriation' without compensation and breached the 'minimum standard of treatment' in NAFTA 1105. Mexico was ordered to pay US$16.7 million (of the US$90 million requested) in compensation.Mexico applied for statutory review of the tribunal award before the BC Supreme Court on the ground that the tribunal had exceeded its jurisdiction. The court set aside part of the award dealing with minimum standards of treatment, but it allowed US$15.6 million of the tribunal's original award of damages to stand. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Elihu Lauterpacht (President), Benjamin R Civiletti (appointed by claimant), José Luis Siqueros (appointed by respondent)
Robert Azinian v. Mexico, ICSID Case No. ARB(AF)/97/2 Notice of Intent submitted on 24 November 1996 US waste management company challenged Mexican court ruling revoking its contract for non-performance of waste disposal and management in Naucalpan de Juarez.Damages sought: more than US$17 million. On 1 November 1999, the tribunal dismissed the investor's claims. It held that the annulment of the concession contract was not an act of expropriation and based on the circumstances of this case, if there was no violation of Article 1110, there was none of Article 1105 either. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Jan Paulsson (President), Benjamin R Civiletti (appointed by claimant), Claus Von Wobeser (appointed by respondent)
Marvin Roy Feldman Karpa v. Mexico, ICSID Case No. ARB(AF)/99/1 Notice of Intent submitted on 20 February 1998 US cigarette exporter challenged Mexican government decision not to rebate taxes on its cigarette exports. Damages sought: US$50 million. On 16 December 2002, the tribunal rejected the investor's expropriation claim, but upheld the claim of a violation of national treatment. Mexico was ordered to pay compensation of US$0.9 million plus US$1 million in interest. Mexico appealed the award in the Ontario Superior Court of Justice. In December 2003, the court dismissed Mexico's application. Mexico's appeal of this decision was rejected by the Ontario Court of Appeal on 11 January 2005. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Konstantinos D Kerameus (President), Jorge CovarrubiasBravo (appointed by claimant), David A Gantz (appointed by respondent)
Waste Management, Inc v. Mexico, ICSID Case No. ARB(AF)/98/2 Notice of Intent submitted on 20 February 1998 US waste management company challenged state and local government actions in contract dispute with a Mexican subsidiary over waste disposal services in Acapulco. Damages sought: US$60 million. Case registered at ICSID on 18 November 1998; tribunal was constituted on 3 June 1999. In its award rendered on 2 June 2000, the tribunal held it lacked jurisdiction because Waste Management had not properly waived domestic legal remedies as required by NAFTA. One of the arbitrators, Mr Keith Highet, issued a dissenting opinion. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Bernardo M Cremades (President), Keith Highet (appointed by claimant), Eduardo Siqueiros T (appointed by respondent), Julio C Treviño (appointed by respondent) (replaced)
SD Myers, Inc v. Canada, ad hoc (UNCITRAL) Notice of Intent submitted on 21 July 1998 Waste disposal firm challenged temporary ban on export of toxic PCB waste. Damages sought: US$20 million. Tribunal held that Canada violated NAFTA Articles 1102 and 1105. It awarded the investors around C$2 million in compensation (including C$850,000 in interest), plus C$500,000 in costs. Canada applied to the federal court to set aside the tribunal's award. On 13 January 2004, the court dismissed Canada's application. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: J Martin Hunter (President), Bryan P Schwartz (appointed by claimant), Edward C Chiasson (appointed by respondent), Bob Rae (appointed by respondent) (replaced)
The Loewen Group Inc and Raymond Loewen v. US, ICSID Case No. ARB(AF)/98/3 Notice of Intent submitted on 29 July 1998 Loewen, a Canadian funeral home operator, challenged a jury verdict in a Mississippi state court that awarded US$500 million in compensation against it. Loewen also alleged that bond requirements for leave to appeal were excessive. Damages sought: US$725 million. In June 2003, the tribunal determined that it 'lacked jurisdiction' to determine the investor's claims and dismissed them. The Loewen Group went bankrupt and assigned its NAFTA claims to a newly created Canadian corporation owned and controlled by the US corporation. The panel ruled that this entity was not a genuine foreign investor capable of pursuing the NAFTA claim. On 31 October 2005, a US court denied Raymond Loewen's petition to vacate the tribunal's award. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Anthony Mason (President), Abner J Mikva (appointed by claimant), Michael Mustill (appointed by respondent),L Yves Fortier (appointed by claimant) (replaced)
Pope & Talbot Inc v. Canada, ad hoc (UNCITRAL) Notice of Intent submitted on 24 December 1998 Challenge to lumber export quota system implementing Canada–US softwood lumber agreement. Damages sought: US$500 million. Tribunal ruled that Canada violated NAFTA Article 1105. Canada ordered to pay US$460,000 in compensation (plus interest) and part of the investor's legal costs, for a total of nearly US$600,000. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Lord Dervaird (President), Benjamin J Greenberg, Murray J Belman (arbitrators)
Mondev International Ltd v. US, ICSID Case No. ARB(AF)/99/2 Notice of Intent submitted on 6 May 1999 The investor alleged that a Massachusetts law immunising local governments from tort liability violates minimum standards of treatment under NAFTA. Damages sought: US$50 million. In October 2002, the tribunal dismissed the investor's claims. It ruled that Mondev's claims were time-barred because the underlying dispute pre-dated NAFTA. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Ninian Stephen (President), James R Crawford (appointed by claimant), Stephen M Schwebel (appointed by respondent)
Methanex Corp v. US, ad hoc (UNCITRAL) Notice of Intent submitted on 2 July 1999 Challenge to California's phase-out of MTBE, a gasoline additive that contaminated ground and surface water throughout California. Damages sought: US$970 million. On 9 August 2005, the tribunal dismissed the investor's claims. It ordered Methanex to pay the US government legal costs of US$3 million and the full cost of the arbitration. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: V V Veeder (President), J William F Rowley (appointed by claimant), W Michael Reisman (appointed by respondent)
Fireman's Fund Insurance Co v. Mexico, ICSID Case No. ARB(AF)/02/1 Notice of Intent submitted on 15 November 1999 US insurance company alleged that the Mexican government discriminated against it by facilitating the sale by Mexican financial institutions of peso-denominated debentures, but not the sale of US dollar-denominated debentures by Fireman's Fund. Damages sought: US$50 million. On 17 July 2006, tribunal dismissed the investor's claim. It determined that, while the investor had been subjected to discriminatory treatment, under the NAFTA financial services chapter rulesonly claims involving expropriation were open to investor–state challenge. It ruled that Mexico's treatment of the investor did not rise to the level of expropriation. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Albert Jan Van Den Berg (President), Andreas F Lowenfeld (appointed by claimant), Alberto Guillermo Saavedra Olavarrieta (appointed by respondent), Francisco Carrillo Gamboa (appointed by respondent) (replaced)
United Parcel Service of America Inc v. Canada, ICSID Case No. UNCT/02/1 Notice of Intent submitted on 19 January 2000 Multinational US courier company alleged that Canada Post's limited monopoly over letter mail and its postal service infrastructure enable it to compete unfairly in express delivery. UPS also alleged that Canada Post enjoyed other advantages denied to the investor (e.g., favourable customs treatment). Damages sought: US$160 million. Notice of Arbitration filed on 19 April 2000. On 24 May 2007, the tribunal dismissed the investor's claims. It determined that key NAFTA rules concerning competition policy could not be invoked by an investor under Chapter 11, and that certain activities of Canada Post were essentially at arm's length from the Canadian government and therefore not subject to challenge by the investor. (Such activities could be scrutinised in a government-to-government dispute.) It also rejected claims that Canada Post unduly benefited from more favourable treatment. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Kenneth Keith (President), Ronald A Cass, L Yves Fortier (arbitrators)
ADF Group Inc v. US, ICSID Case No. ARB(AF)/00/1 Notice of Intent submitted on 1 March 2000 Challenge to US 'Buy America' preferences requiring that US steel be used in federally funded state highway projects. Damages sought: US$90 million. In January 2003, the tribunal dismissed the investor's claim. It concluded that the measures in question were procurement measures exempted under Article 1108. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Florentino P Feliciano (Presidnet), ArmandDe Mestral (appointed by claimant), Carolyn B Lamm (appointed by respondent)
Waste Management Inc v. Mexico, ICSID Case No. ARB(AF)/00/3 Notice of Arbitration submitted on 19 June 2000 US waste management company challenged state and local government actions in contract dispute with a Mexican subsidiary over waste disposal services in Acapulco. Damages sought: US$60 million. The investor resubmitted its Notice of Arbitration in this case to address the deficiencies in its waiver of domestic remedies (see above). The tribunal subsequently confirmed its jurisdiction. On 30 April 2004, it dismissed the investor's claims on the ground that there was nothing that could be properly described as an expropriation by Mexico and the conduct of Mexico did not otherwise violate NAFTA. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: James R Crawford (President), Benjamin R Civiletti (appointed by claimant), Eduardo Magallón Gómez (appointed by respondent), Guillermo Aguilar-Álvarez (appointed by respondent) (replaced)
Ketcham Investments, Inc & Tysa Investments, Inc v. Canada Notice of Intent submitted on 22 December 2000 Challenge to lumber export quota system put in place to implement Canada–US softwood lumber agreement. Damages sought: C$30 million. Claim was withdrawn by investors in May 2001. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Trammel Crow Co v. Canada Notice of Intent submitted on 7 September 2001 US property management company alleged that Canada Post treated it unfairly in the outsourcing of certain real estate services. Damages sought: US$32 million. Claims were withdrawn by investor in April 2002 after it reached an undisclosed settlement with Canada Post. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Billy Joe Adams et al v. Mexico Notice of Intent submitted on 10 November 2000 A group of US property investors disputed a Mexican court decision regarding title to real estate and related claims. Damages sought: US$75 million. Notice of Arbitration was submitted on 16 February 2001. Claim is inactive. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Lomas de Santa Fe v. Mexico Notice of Intent submitted on 28 August 2001 US investor alleged that it was treated unfairly and inadequately compensated in a dispute over the expropriation of land by Mexican authorities. Investor sought US$210 million in damages. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Canfor Corporation v. US Notice of Intent submitted on 5 November 2001 Canadian lumber company challenged US anti-dumping regulation and countervailing duties imposed on Canadian softwood lumber exports as well as relating to the Byrd Amendment. Damages sought: US$250 million. Notice of Arbitration submitted on 9 July 2002. On 7 September 2005, at the request of the US government, the Canfor, Terminal and Tembec claims were consolidated into a single arbitration. On 6 June 2006, the tribunal determined that it had no jurisdiction over claims relating to US dumping and countervailing duty law, but that it did have jurisdiction to decide claims regarding the Byrd Amendment. Canfor withdrew its claim as a condition of the October 2006 Softwood Lumber Agreement between the US and Canadian governments. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal (before consolidation): Emmanuel Gaillard (President), Joseph Weiler, Conrad Harper (arbitrators) Arbitral tribunal (after consolidation): Albert Jan Van Den Berg (President), Armand LC de Mestral, Davis R Robinson (both appointed by the Secretary-General of ICSID)
Gami Investments Inc v. Mexico, ad hoc (UNCITRAL) Notice of Intent submitted on 1 October 2001 US shareholders in a Mexican sugar company claimed that their interests were harmed by Mexican government regulatory measures related to processing and export of raw and refined sugar, as well as the nationalisation of failing sugar refineries. Damages sought: US$55 million. On 15 November 2004, the tribunal ruled that it had no jurisdiction and dismissed the investor's claim. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Jan Paulsson (President), W Michael Reisman (appointed by claimant), Julio Lacarte Muró (appointed by respondent)
Chemtura Corp v. Canada, PCA Case No. 2008-01 (UNCITRAL) Notice of Intent submitted on 6 November 2001 Challenge to the Canadian government's ban on the sale and use of lindane, an agricultural pesticide. Damages sought: US$100 million. On 2 August 2010, the tribunal dismissed the investor's claims. It ordered the investor to pay the costs of the arbitration (US$688,000) and to pay 50 per cent of the government of Canada's costs in defending the claim (C$5.778 million). Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Gabrielle Kaufmann-Kohler (President), James R Crawford, Charles N Brower (arbitrators)
Francis Kenneth Haasv. Mexico Notice of Intent submitted on December 12, 2001 US investor in manufacturing company in Mexico alleged unfair treatment by Mexican courts and authorities in the investor's dispute with local partners in the company.Damages sought: approximately US$35 million. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Calmark Commercial Development Inc v. Mexico Notice of Intent submitted on 11 January 2002 US property development company challenged decision of Mexican courts in a property dispute. Damages sought: US$400,000. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Kenex Ltd. v. US Notice of Intent submitted on January 14, 2002 Canadian manufacturer of industrial hemp products objected to seizure of products under US Drug Enforcement Agency rules. Damages sought: US$20 million. Notice of Arbitration was submitted on 2 August 2002. In February 2004, a US court granted Kenex's petition to prohibit enforcement of DEA rules barring certain hemp products. Claim is inactive. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Robert J Frank v. Mexico Notice of Intent submitted on 12 February 2002 US investor sought compensation from Mexico in dispute over development of beachfront property in Baja, California. Damages sought: US$1.5 million. Notice of Arbitration was submitted on 31 July 2002. Claim is inactive. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
James Russell Baird v. US Notice of Intent submitted on 15 March 2002 Canadian investor challenged US regulation banning disposal of radioactive waste at sea or below sea level. Damages claimed: US$13.58 billion. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
International Thunderbird Gaming Corp v. Mexico, ad hoc (UNCITRAL) Notice of Intent submitted on 22 March 2002 Canadian gambling company challenged the regulation and closure of its gambling facilities by the Mexican government. Damages sought: US$100 million. On 26 January 2005, the tribunal dismissed the investor's claim.Thunderbird Gaming was ordered to pay Mexico's legal costs of approximately US$1.2 million and three-quarters of the cost of the arbitration. On 14 February 2007, a US court rejected Thunderbird Gaming's petition to vacate the NAFTA tribunal's ruling. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Albert Jan Van Den Berg (President), Thomas W Wälde (appointed by claimant), Agustín Portal Ariosa (appointed by respondent)
Doman Inc v. US Notice of Intent submitted on 1 May 2002 Challenge to US anti-dumping regulation and countervailing duties imposed on Canadian softwood lumber exports as well as relating to the Byrd Amendment. Damages claimed: US$513 million. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Tembec Inc et al v. US Notice of Intent submitted on 3 May 2002 Challenge to US anti-dumping regulation and countervailing duties imposed on Canadian softwood lumber exports as well as relating to the Byrd Amendment. Damages claimed: US$200 million. Notice of Arbitration and Statement of Claim submitted on 3 December 2004.On 7 September 2005, the Canfor, Terminal and Tembec claims were consolidated into a single arbitration. In December 2005, Tembec withdrew its claim. It then unsuccessfully challenged the consolidation order in US courts. In July 2007, the tribunal ordered Tembec to pay part of the arbitration costs as well as part of the legal costs of the US. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Albert Jan Van Den Berg (President), Armand LC de Mestral, Davis R Robinson (both appointed by the Secretary-General of ICSID)
Paget et al & 800438 Ontario Limited v. US Notice of Intent submitted on 9 September 2002 Property of three Florida subsidiaries of an Ontario company was seized following allegations of racketeering, corrupt practices and tax violations. Ontario Ltd claimed that the US improperly refused to return its property and destroyed its financial records. Damages claimed: US$38 million. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Corn Products International v. Mexico, ICSID Case No. ARB(AF)/04/1 Notice of Intent was submitted on 28 January 2003 Challenge to a range of Mexican government measures that allegedly discouraged the import, production and sale of high-fructose corn syrup (HFCS), including a tax on soft drinks sweetened with HFCS. Mexico argued that it applied the 20 per cent tax to protect its sugar cane industry, which is losing domestic market share to imported HFCS, while facing barriers in selling sugar in US. Damages sought: US$325 million. Mexico sought to consolidate the claims with those of Archer Daniels. The Archer tribunal denied the request on 20 May 2005. In January 2008, the tribunal ruled that Mexico had violated NAFTA's national treatment obligation. It dismissed the investor's claims that the tax was a prohibited performance requirement and tantamount to expropriation. After a July 2008 hearing on quantum, in August 2009, Mexico was ordered to pay the investor US$58.4 million. On 1 October 2009, the claimant filed a request for correction and interpretation of the award. On 23 March 2010, the tribunal issued a decision denying the claimants' request for correction and interpretation. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Christopher Greenwood (President), Andreas F Lowenfeld (appointed by claimant), Jesus Serrano De La Vega (appointed by respondent), Manuel E Tron (appointed by respondent) (replaced)
Terminal Forest Products Ltd v. US Notice of Intent submitted on 12 June 2003 Challenge to US anti-dumping regulation and countervailing duties imposed on Canadian softwood lumber exports as well as relating to the Byrd Amendment. Damages claimed: US$90 million. Notice of Arbitration submitted on 31 March 2004. On 7 September 2005, the Canfor, Terminal and Tembec claims were consolidated into a single arbitration. On 6 June 2006, the tribunal determined that it had no jurisdiction over claims relating to US dumping and countervailing duty law, but that it did have jurisdiction to decide claims regarding the Byrd Amendment. Terminal withdrew its claim as a condition of the October 2006 Softwood Lumber Agreement between the US and Canadian governments. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal (after consolidation): Albert Jan Van Den Berg (President), Armand LC de Mestral, Davis R Robinson (both appointed by the Secretary-General of ICSID)
Glamis Gold Ltd v. US Notice of Intent submitted on 21 July 2003 Allegations that regulations intended to limit environmental impact of open-pit mining and to protect indigenous peoples' religious sites made proposed gold mine in California unprofitable, thereby expropriating investment and denying fair and equitable treatment. Damages claimed: over US$50 million. Notice of Arbitration submitted on 9 December 2003. On 8 June 2009, the tribunal dismissed the investor's claims, finding that the environmental regulations were not sufficiently severe to constitute an expropriation or minimum standards or treatment. It ordered the company to pay two-thirds of the costs of the proceeding. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Michael K Young (President), Kenneth D Hubbard (appointed by claimant), Donald L Morgan (appointed by claimant) (resigned), David Caron (appointed by respondent)
Grand River Enterprises Six Nations Ltd et al v. US, ad hoc (UNCITRAL) Notice of Intent was submitted on 15 September 2003 Allegations that business was harmed by the treatment of 'non-participating manufacturers' under the terms of a settlement agreement between 46 US states and the major tobacco companies to recoup public monies spent to treat smoking-related illnesses. Damages sought: more than US$340 million. In January 2011, after protracted proceedings, the tribunal dismissed the manufacturer's claim on jurisdictional grounds and dismissed the wholesaler's claim on its merits. It ruled that the costs of arbitration be split equally between the parties. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Fali S Nariman (President), James Anaya (appointed by claimant), John R Crook (appointed by respondent)
Archer Daniels Midland v. Mexico, ICSID Case No. ARB(AF)/04/5 Notice of Intent was submitted on 14 October 2003 Challenge to a range of Mexican government measures that allegedly discouraged the import, production and sale of HFCS, including a tax on soft drinks sweetened with HFCS. Damages sought: US$100 million. Mexico sought to consolidate the claims with those of Corn Products International. The tribunal denied the request on 20 May 2005. In November 2007, the tribunal ruled that Mexico had violated NAFTA's national treatment obligation, and that the tax on HFCS constituted a prohibited performance requirement. Mexico was ordered to pay the investors US$33.5 million. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Bernardo M Cremades (President), Arthur W Rovine, Eduardo Siqueiros (arbitrators)
Albert J Connolly (Brownfields Holding, Inc) v. Canada Notice of Intent submitted on 19 February 2004 US investor claimed actions of Ontario mining agency resulted in forfeiture of investor's interest in a quarry site. Amount in dispute not available. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Contractual Obligation Productions LLC et al v. Canada Notice of Intent submitted on 15 June 2004 US animation production company challenged decision that it was ineligible for Canadian federal tax credits, and challenged Canadian immigration and work restrictions. Damages claimed: US$20 million. Statement of Claim submitted on 31 January 2005; amended Statement of Claim submitted on 16 June 2005. Claim is inactive. Arbitration rules:UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Canadian Cattlemen for Fair Trade v. US Notice of Intent submitted on 12 August 2004 Over 100 Canadian cattle farmers challenged US ban on imports of Canadian live cattle following discovery in 2003 of a cow infected with bovine spongiform encephalopathy from a herd in Alberta. Damages claimed: over US$235 million. The first Notices of Arbitration were submitted on 16 March 2005; with subsequent Notices of Arbitration by each of the claimants submitted between 16 March 2005 and 2 June 2005. Over 100 claims were consolidated into a single arbitration. In January 2008, the tribunal dismissed the claims on jurisdictional grounds because they determined the claimants did not make or have an investment in the US, but only in Canada. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Karl-Heinz Böckstiegel (President), James Bacchus (appointed by claimant), Lucinda Low (appointed by respondent)
Bayview Irrigation District et al v. Mexico, ICSID Case No. ARB(AF)/05/1 Notice of Intent was submitted on 27 August 2004 Seventeen Texas irrigation districts claimed that the diversion of water from Mexican tributaries of the Rio Grande watershed discriminated against downstream US water users, breached Mexico's commitments under bilateral water-sharing treaties and expropriated water 'owned' by US interests. Damages sought: US$554 million. On 21 June 2007, the tribunal dismissed the claims and ruled that the claimants, who were US nationals whose investments were located within the territory of the US, did not qualify as foreign investors entitled to protection under NAFTA. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal:Vaughan Lowe (President), Edwin Meese III (appointed by claimant), Ignacio Gómez Palacio (appointed by respondent)
Cargill Inc v. Mexico, ICSID Case No. ARB(AF)/05/2 Notice of Intent submitted on 30 September 2004 A large US agri-business challenged a range of Mexican government measures that allegedly discouraged the import, production and sale of HFCS, including a tax on soft drinks sweetened with HFCS. Damages sought: more than US$100 million. The tribunal found against Mexico in an award rendered on 18 September 2009. Mexico was ordered to pay the investor US$77.3 million plus US$13.4 million in interest for a total award of US$90.7 million. The decision was upheld by the Supreme Court of Canada. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Michael C Pryles (President), David D Caron (appointed by claimant), Donald M McRae (appointed by respondent)
Peter Pesic v. Canada Notice of Intent submitted on26 July 2005 US investor claimed that Canadian government decision not to extend his temporary work visa impaired his investments in Canada. Notice of intent to submit claim to arbitration was withdrawn by the investor. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
GL Farms LLC and Carl Adams v. Canada Notice of Intent submitted on 28 February 2006 US agribusiness challenged Canadian provincial and federal government restrictions on the import of milk and requirements on quotas for milk products in Ontario. Damages claimed: US$78 million. Notice of Arbitration received on 5 June 2006. Inactive. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Merrill & Ring Forestry LP v. Canada, ICSID Case No. UNCT/07/1 Notice of Intent submitted on 25 September 2006 US forestry company alleged that Canadian federal and provincial regulations and policies restricting export of forestry products represent discriminatory treatment, expropriation and violate minimum standards of treatment. Damages claimed: US$25 million. Award on 31 March 2010. Tribunal dismissed the investor's claims and ordered the costs of the proceedings be split between the two parties. It determined the investor had not demonstrated that minimum standards of treatment had been violated. Arbitration rules: ICSIDAdministering institution: ICSIDArbitral tribunal: Franciso Orrego Vicuña (President, appointed by Secretary-General), Kenneth Dam (appointed by claimant), J William Rowley (appointed by respondent)
Vito G Gallo v. Canada Notice of Intent submitted on 12 October 2006 Claim filed following transfer of control of a project asserting legislation was 'tantamount to expropriation' and depriving the minimum standard of treatment. Damages sought: C$105 million. Statement of Claim submitted on 23 June 2008. Jurisdictional hearing in February 2011. Award issued on 15 September 2011 dismissing the claims on jurisdictional grounds. The tribunal concluded that Mr Gallo could not prove that he acquired ownership and control prior to enactment of the legislation. He was ordered to pay Canada US$450,000 towards its legal costs. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Juan Fernández-Armesto (President), Jean-Gabriel Castel (appointed by claimant), Laurent Lévy (appointed by respondent)
Domtar Inc v. US Notice of Intent submitted on 16 April 2007 Domtar filed claims regarding US anti-dumping regulations and countervailing duties imposed on Canadian softwood lumber exports as well as relating to the Byrd Amendment. It also challenged aspects of the 2006 Softwood Lumber Agreement between the US and Canada, claiming these measures discriminated against it, denied it minimum standards of treatment under international law and prevented timely transfer of profits from its US operations. Damages claimed: over US$200 million. Notice of Arbitration and Statement of Claim submitted on 16 April 2007. Claim is inactive. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Mobil Investments Canada Inc & Murphy Oil Corporation v. Canada, ICSID Case No. ARB(AF)/07/4 Notice of Intent for Mobil Investments submitted on 2 August 2007; Notice of Intent for Murphy Oil submitted on 3 August 2007 The investors alleged that Canadian guidelines stipulating that energy companies active in the offshore invest in research and development within Newfoundland and Labrador were NAFTA-inconsistent performance requirements. The claimants previously challenged these guidelines in the Canadian courts and lost. Damages sought: C$60 million. On 22 May 2012, the tribunal ruled that the local R&D requirements constituted a 'prohibited performance requirement' under Article 1106. It rejected Canada's arguments that the guidelines fell within the scope of the Canadian reservation with respect to Article 1106. It also dismissed the investors' claim that the R&D guidelines breached Article 1105. The tribunal majority found Canada has been violating NAFTA Article 1106 since 2004, meaning that as long as the R&D guidelines remain in effect, damages will accrue. The award was issued in February 2015. Damages were set at US$132 million. A set-aside application by Canada in the Federal Court was dismissed. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Hans Van Houtte (President), Merit Janow (appointed by claimant), Philippe Sands (appointed by respondent)
Apotex Inc v. US (I), ICSID Case No. UNCT/10/2 Notice of Intent submitted on 21 September 2007 In 2003, Apotex sought US Food and Drug Administration (FDA) approval to develop a generic version of Pfizer's anti-depressant medication, Zoloft (sertraline hydrochloride once Pfizer's patent expired in 2006). Apotex later went to court to dispel uncertainty regarding the status of the Pfizer patents. US courts dismissed Apotex's suit for a declaratory judgment clarifying the patent situation. Apotex alleged that the US court judgments discriminated against it, denied it minimum standard of treatment and expropriated its investment in sertraline. Damages sought: US$8 million. On 14 June 2013, the tribunal dismissed the claim on jurisdictional grounds, ruling that Apotex did not have investments in the US that qualified for protection under NAFTA Chapter 11. Apotex was ordered to pay all costs of the proceedings. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Toby Landau (President), Clifford M Davidson (appointed by claimant), Fern M Smith (appointed by respondent)
Apotex Inc v. US (II), ICSID Case No. UNCT/10/2 Notice of Intent submitted on 2 March 2009 Apotex sought FDA approval to develop a generic version of heart medication pravastatin sodium tablets marketed by Bristol Myers Squibb (BSM) (under the brand name Pravachol once BSM's patent expired in 2006). Apotex alleged that certain US court judgments and FDA decisions discriminated against it, denied it minimum standard of treatment and expropriated its investment in pravastatin. Damages sought: US$8 million. By agreement of the parties, the jurisdiction phase in this arbitration (the pravastatin claim) and the above arbitration (the sertraline claim) were held concurrently, even though they were not consolidated. Determinations on preliminary issues in both arbitrations were set out in a single award. Both claims were dismissed on jurisdictional grounds. The tribunal held that Apotex did not have investments in the US that qualified for protection under NAFTA Chapter 11. Apotex was ordered to pay all costs of the proceedings. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Toby Landau (President), Clifford M Davidson (appointed by claimant), Fern M Smith (appointed by respondent)
Gottlieb Investors Group v. Canada Notice of Intent submitted on 22 April 2008 US-based private investor group alleged that changes in tax treatment of energy income tax trusts discriminated against US entities and were equivalent to expropriation, and violated minimum standards of treatment. Damages sought: US$6.5 million. The investor was barred from bringing the expropriation claim. It could have proceeded on its other claims (Articles 1102, 1103 and 1105) but no Notice of Arbitration has been submitted to date. The claim has been inactive since the determination made by US and Canadian tax authorities. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Clayton/Bilcon Inc v. Canada, PCA Case No. 2009-04 (UNCITRAL) Notice of Intent submitted on 5 February 2008 The investor alleged that the administration of an environmental assessment review, along with various provincial and federal government measures, were discriminatory or violated minimum standards of treatment, or both. Damages sought: US$101 million. The tribunal found in favour of Bilcon, noting that the regulatory process was unfair in that it introduced new concepts and principles without notice. Canada attempted to have the award set aside by the Federal Court in an application filed on 16 June 2015, but it was dismissed by the Court on 2 May 2018. A hearing on damages was held between 19–27 February 2018. Bilcon claimed over US$440 million. On 10 January 2019, the tribunal issued an award granting claimants only US$7 million, a bit more than their sunk costs. The tribunal appears to have reached this conclusion because it was not convinced that the quarry project would have been approved absent Canada's NAFTA breaches. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Bruno Simma (President), Bryan Schwartz (appointed by claimant), Donald M McRae (appointed by respondent)
Georgia Basin Holdings LP v. Canada Notice of Intent submitted on 5 February 2008 Allegations that Canadian federal and provincial regulations and policies restricting export of forestry products represent discriminatory treatment, expropriation and violate minimum standards of treatment. Damages sought: US$5 million. This claim is inactive. In late 2007, counsel for Merrill & Ring requested Georgia Basin Holdings be added as a party to the Merrill & Ring arbitration. On 31 January 2008, the tribunal decided not to allow Georgia Basin to participate in the arbitration. Claimant has not brought separate claims against Canada to date. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Francisco Orrego Vicuña (President), Kenneth W Dam (appointed by claimant), J William Rowley (appointed by respondent)
Melvin J Howard, Centurion Health Corporation v. Canada, PCA No. 2009-21 Notice of Intent submitted on 11 July 2008 US investor alleged plans for private, fee-for-service health clinics in British Columbia and Alberta were frustrated by local, provincial and federal regulatory measures. Damages sought: US$160 million. Notice of Arbitration submitted on 5 January 2009. Revised Statement of Claim submitted on 2 February 2009. In August 2010, the tribunal terminated the claim because the investor failed to make the required deposits to continue the claim. The claimant was ordered to pay Canada's share of the arbitration costs. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Peter Tomka (President), Marjorie Florestall (appointed by claimant), Henri C Álvarez (appointed by respondent)
Dow Agro Sciences LLC v. Canada Notice of Intent submitted on 25 August 2008 Dow Agro Sciences manufactures 2,4-D, an active ingredient in many commercial herbicides. In 2006, the Province of Quebec banned the use of these pesticides. Dow Agro Sciences alleged that the ban is without scientific basis and was imposed without providing a meaningful opportunity for the company to demonstrate that its product is safe. Dow further alleged that the ban is 'tantamount to expropriation'. Damages sought: more than US$12 million. On 25 May 2011, the parties reached a settlement under which Dow withdrew its claim. In return, the government of Quebec formally acknowledged that 2,4-D does not pose an 'unacceptable risk' to human health. The disputed regulatory measures related to pesticides are maintained and no compensation has been paid to the claimant. Arbitration rules: UNCITRALAdministering institution: Data not availableArbitral tribunal: Not constituted
William Jay Greiner and Malbaie River Outfitters Inc v. Canada Notice of Intent submitted 10 September 2008 Allegations that conservation measures taken by Quebec provincial government to reduce the number of salmon fishing licences and efforts to restrict access to certain salmon fishing areas, amounted to expropriation and discriminated against investor in favour of Canadian-owned fishing lodges in violation of minimum standards of treatment. Damages sought: US$7.5 million. Notice of Arbitration was submitted on 2 November 2010. Amended Notice of Arbitration was submitted on 2 December 2010. Claim was withdrawn by investor on 10 June 2011. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Shiell Family v. Canada Notice of Intent submitted on 14 October 2008 US family group of investors alleged Canadian courts and government agencies treated them unfairly during bankruptcy proceedings. Damages sought: US$21.3 million. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
David Bishop v. Canada Notice of Intent submitted on 8 October 2008 Allegations that conservation measures taken by Quebec provincial government to reduce the number of salmon fishing licences and efforts to restrict access to certain salmon fishing areas, amounted to expropriation and discriminated against investor in favour of Canadian-owned fishing lodges in violation of minimum standards of treatment. Damages sought: US$1 million. No Notice of Arbitration has been filed to date. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Christopher and Nancy Lacich v. Canada Notice of Intent submitted on 2 April 2009 US investors alleged changes in tax treatment of energy income tax trusts were discriminatory, equivalent to expropriation of their investment and violated minimum standards of treatment. Damages sought: approximately US$1.2 million. Notice of Intent was quickly withdrawn by investor. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
AbitibiBowater Inc v. Canada, ICSID Case No. UNCT/10/1 Notice of Intent submitted on 23 April 2009 In December 2008, the provincial government enacted legislation to return AbitibiBowater's water use and timber rights to the Crown and to expropriate certain AbitibiBowater lands and assets associated with the water and hydroelectricity rights. Damages sought: C$467.5 million. In August 2010, the Canadian federal government announced that it had agreed to pay AbitibiBowater C$130 million to settle the claim. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Andreas Bucher (President), Doak Bishop (appointed by claimant), Gavan Griffith (appointed by respondent)
CANACAR v. US Notice of Arbitration submitted on 2 April 2009 Truckers asserted that the US failed to permit Mexican truckers into the US to provide cross-border trucking services, barred them from investing in US companies providing cross-border trucking services and violated minimum standards of treatment by refusing to comply with a NAFTA government-to- government panel ruling. Damages sought:approximately US$2 billion a year. Notice of Arbitration filed on 2 April 2009. In 2011, US and Mexico agreed to a three-year memorandum that allowed Mexican trucks to enter the US under certain conditions. In exchange, Mexico eliminated US$2.3 billion tariffs on US goods. There is no information that this case was withdrawn or otherwise terminated, although there has been no activity for many years. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Thomas Heather Rodríguez (appointed by claimant)
Cemex v. US Notice of Intent reportedly submitted in September 2009 Cemex is embroiled in a dispute with the state government of Texas over royalty fees on quarrying. The NAFTA claim is an attempt by Cemex to protect itself against potential losses in Texan courts. Unavailable. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Detroit International Bridge Company v. Canada, PCA Case No. 2012-25 (UNCITRAL) Notice of Intent was submitted on 25 January 2010 Detroit International Bridge Company (DIBC) objected to Canadian government plans to build a second bridge across the Detroit River. Canada contended that the arbitration should be 'time-barred' because the investor filed the claim more than three years after learning about the alleged breaches. Damages sought: US$3.5 billion. DIBC alleged that Canada had reneged on a commitment to build a direct connection between the Ontario 401 highway to the Ambassador bridge owned by DIBC and instead connected to the new proposed Gordie Howe bridge. On 2 April 2015, the NAFTA tribunal issued its award on jurisdiction dismissing the DIBC claim against Canada. The majority determined that the ongoing lawsuits by DIBC against Canada in the US District Court for the District of Columbia with respect to the same measures as those alleged in NAFTA meant that DIBC had failed to comply with the waiver requirements in Article 1121, which deprived the tribunal of jurisdiction of the entire dispute. The tribunal ordered DIBC to pay Canada C$2 million in costs. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Yves Derains (President), Michael Chertoff, Vaughan Lowe (arbitrators)
John R Andre v. Canada Notice of Intent submitted on 19 March 2010 Allegations that conservation measures taken to decrease the number of caribou that can be hunted expropriated investment. Damages sought: over US$4 million. No Notice of Arbitration has been submitted to date. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
International Vision (INVISA) et al v. Mexico Notice of Intent submitted on 15 February 2011 A group of US investors alleged a decision not to renew a 10-year agreement regarding billboards on Mexican land near the US–Mexico border crossing constituted expropriation and violation of minimum standards of treatment. Damages sought: US$7.5 million. No Notice of Arbitration has been submitted to date. Arbitration never commenced. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
St Marys VCNA LLC v. Canada, PCA Case No. 2012-19 (UNCITRAL) Notice of Intent was submitted on 13 May 2011 St Mary's VCNA, alleged that its Canadian subsidiary, St Mary's Cement Inc, was the victim of political interference in its attempt to open a quarry. The Ontario Ministry for Municipal Affairs and Housing issued a zoning order that prevented the site from being converted from agricultural to extractive industrial use. St Mary's claimed the 2010 zoning order was unfair, arbitrary, discriminatory and expropriatory. Damages sought: US$275 million. Canada attempted to have the claim dismissed pursuant to NAFTA Article 1113 on the grounds that St Mary's VCNA was a Brazilian-owned company without substantial US business activities and therefore did not qualify as a US investor. The parties reached a settlement on 28 February 2013, which saw St Mary's withdraw the claim in exchange for US$15 million in compensation from the Ontario government. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Michael C Pryles (President), Richard Stewart (appointed by claimant), Brigitte Stern (appointed by respondent)
Mesa Power Group LLC v. Canada, PCA Case No. 2012-17 (UNCITRAL) Notice of Intent submitted on 6 July 2011 The Ontario feed-in tariff (FIT) programme provides incentives for renewable energy producers. Under this programme, projects are ranked to determine priority for government power purchase agreements and access to the transmission grid. The claimant alleged that 2011 changes to the FIT programme discriminated against Mesa by favouring other local and international investors. Damages sought: C$775 million. In May 2016, the tribunal, with one dissent, dismissed all of Mesa's complaints and awarded Canada 30 per cent of its legal costs of C$3 million. Mesa appealed this decision to the District Court in Washington, DC. The court denied Mesa's petition to vacate and granted Canada's counter-petition to enforce the award issued on 15 June 2017. The case is concluded. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Gabrielle Kaufmann-Kohler (President), Charles N Brower (appointed by claimant), Toby Landau (appointed by respondent)
Apotex Holdings Inc and Apotex Inc v. US, ICSID Case No. ARB(AF)/12/1 Notice of Intent submitted on 23 November 2011 Following an inspection of Apotex in 2009, Canadian manufacturing facilities and the FDA discovered deficiencies and issued an import alert on drugs produced in Apotex's facilities. Apotex claimed that the import alert resulted in substantial lost sales and claimed that similar measures were not taken by the FDA against Apotex's competitors. Therefore, the measures were discriminatory and violated minimum standards of treatment.Damages sought: US$520 million (reported). On 25 August 2014, the tribunal dismissed all claims. By a 2:1 majority, the tribunal ruled that it lacked jurisdiction over certain claims that the tribunal found to be res judicata. The tribunal concluded that the import alert was a 'lawful and appropriate' exercise of the FDA's regulatory authority. The tribunal ordered Apotex to pay the US government's legal costs and three-quarters of the costs of the arbitration. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: V V Veeder (President), J William Rowley (appointed by claimant), John R Crook (appointed by respondent)
Mercer International, Inc. v. Canada, ICSID Case No. ARB(AF)/12/3 Notice of Intent submitted on 26 January 2012 Allegations that US investor was disadvantaged regarding other mills in the province with self-generating capabilities because of subsidies, preferential treatment and other measures by the provincial government towards its competitors. Damages sought: C$232 million. Notice of Arbitration submitted on 30 April 2012. Registered at ICSID on 16 May 2012. Tribunal was constituted on 9 October 2012. It rendered an award on 6 March 2018, dismissing the claimant's claims and ordering it to pay C$9 million toward Canada's legal costs. The parties were ordered to split the arbitration costs. Claimant registered a request for a supplementary decision on 20 April 2018. The tribunal issued a decision on that request on 10 December 2018. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: V V Veeder (President), Franciso Orrego Vicuña (appointed by claimant), Zachary Douglas (appointed by respondent)
Windstream Energy LLC v. Canada, PCA Case No. 2013-22 (UNCITRAL) Notice of Intent submitted on 17 October 2012 In 2009, Windstream signed a 20-year FIT contract with the Ontario Power Authority for the purchase of renewable energy. In February 2011, the government of Ontario announced a moratorium on freshwater offshore wind development on the grounds that further scientific research was needed into the impacts. Windstream claimed that the moratorium is discriminatory and tantamount to expropriation. Damages sought: C$475 million. In December 2016, the tribunal ruled that it would dismiss the Windstream indirect expropriation claim but grant the claim that the offshore moratorium was unfair and inequitable, awarding Windstream damages of C$25 million and C$3 million in legal costs. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Veijo Heiskanen (President), R Doak Bishop (appointed by claimant), Bernardo Cremades (appointed by respondent)
Eli Lilly and Company v. Canada, ICSID Case No. UNCT/14/2 Notice of Intent submitted on 7 November 2012 Zyprexa was first patented in Canada in 1980. Eli Lilly received a patent extension in 1991 on the ground that it had found new uses for the drug. In 2009, the Canadian Federal Court invalidated the patent extension based on a finding that the drug allegedly had not delivered the promised utility. Eli Lilly contested the invalidation of its patents in the Canadian courts. When it lost there, Eli Lilly filed under NAFTA claiming the new test was discriminatory. Damages sought: C$500 million. On 17 March 2017, the tribunal dismissed Eli Lilly's claims and concluded that Canada was in full compliance with its NAFTA obligations. The tribunal ordered Eli Lilly to bear 75 per cent of Canada's legal costs, in addition to Canada's arbitration costs. Those costs were approximately C$5.2 million. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Albert Jan Van Den Berg (President), Daniel Bethlehem (appointed by claimant), Gary B Born (appointed by respondent)
Lone Pine Resources Inc v. Canada, ICSID Case No. UNCT/15/2 Notice of Intent submitted on 8 November 2012 US oil and gas exploration company challenged the government of Canada's revocation of exploration licences located in the St Lawrence River, claiming that it was not meaningfully consulted or compensated for the revoked permit and loss of potential revenue. Damages sought: US$119 million. This case is pending. Notice of Arbitration was submitted on 6 September 2013. Response to the Notice of Arbitration was submitted on 27 February 2015. A hearing on the merits was held in Toronto in October 2017. The President of the tribunal died unexpectedly in March 2020. He was replaced on 21 September 2020 by Albert Jan Van Den Berg. On 11 February 2021, the tribunal held a pre-hearing organisational meeting by video conference. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Albert Jan VAN DEN BERG (President), David R Haigh (appointed by claimant), Brigitte Stern (appointed by respondent), V V Veeder (President) (died)
Kellogg, Brown and Root (KBR) v. Mexico, ICSID Case. No. UNCT/14/1 Notice of Intent submitted on 19 February 2013 A US energy services company sought damages against the government of Mexico related to a 2011 decision by the Mexican courts to annul a US$320 million arbitration award issued by the International Chamber of Commerce in December 2009. The original arbitration related to a contract dispute between Pemex, the Mexican state energy company, and COMMISSA, a KBR subsidiary. Damages sought: more than US$400 million. On 30 April 2015, in an unpublished award the arbitrators dismissed the claim. KBR was using the NAFTA claim to collect a large commercial arbitration award KBR had obtained against the Mexican state oil company. That award was set aside by the Mexican court and was subject to enforcement proceedings in the US and Luxembourg. The dispute between Pemex and COMMISSA was settled. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Andrés Rigo Sureda (President), Gabrielle Kaufmann-Kohler (appointed by claimant), Gerardo Lozano Alarcón (appointed by respondent)
JM Longyear, LLC v. Canada Notice of Intent submitted on 14 February 2014 Assertion that companies were improperly denied tax incentives for sustainable forestry management. Damages sought: C$12 million. Notice of Arbitration was submitted on 20 May 2014. Investor formally withdrew the claim on 26 June 2015. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
Stanford Ponzi Scheme Victims v. US Request for Arbitration and Statement of Claim submitted on 20 March 2013 North American investors submitted claims against The Governments of the US. The investors allege that the US acted inconsistently with its obligations under Section A of Chapter 11 of NAFTA. They further contend that Stanford Financial Group was created for the purpose of defrauding investors, primarily foreign nationals from Latin America. Mr. Stanford was convicted of fraud and sentenced to 110 years in prison in 2012. However, according to the investor, the US government failed to initiate actions to protect their interests. Damages sought no less than US$511 million. The claimants appointed David R. Haigh as their nominee to the tribunal. This case is still pending. Arbitration rules: UNCITRAL and/or ad-hocAdministering institution: N/AArbitral tribunal: David R. Haigh (appointed by claimants)
JM Longyear, LLC v. Canada Notice of Intent submitted on 14 February 2014 Assertion that companies were improperly denied tax incentives for sustainable forestry management. Damages sought: C$12 million. Notice of Arbitration was submitted on 20 May 2014. Investor formally withdrew the claim on 26 June 2015. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Not constituted
B-Mex, et al v. Mexico, ICSID Case No. ARB(AF)/16/3 Notice of Intent submitted on 23 May 2014 US gaming investors allege that after parting ways with their Mexican business partner, their five Mexican casinos were targeted and harassed by Mexican authorities. Damages sought: US$100 million. This case is pending. Notice of Arbitration submitted on 15 June 2016. Respondent's memorial on jurisdictional objections submitted on 30 May 2017.A hearing on jurisdiction was held from 21–25 May 2018. In August 2018, both claimants and respondent submitted post-hearing submissions. The US and Canada both filed a written submission as non-disputing state parties on 28 February and 17 August 2018. On 23 November 2018, the tribunal invited the parties and non-disputing state parties to submit additional written submissions on a jurisdictional issue by 7 December 2018. On 21 December 2018, both parties provided written submissions in response to the tribunal's procedural order. On that same date, the US also filed an additional written submission as a non-disputing state party. On 19 July 2019, the tribunal rendered a partial award finding it has jurisdiction and award claimant half of its costs. On 2 October 2019, the tribunal issued Procedural Order No. 8 establishing a timetable for the merits phase. On 20 July 2020, the Superior Court of Justice of Ontario declined Mexico's request to set aside the partial award. A hearing on the merits provisionally is planned for November 2021, with disclosure and various written submissions to occur prior to that date. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Gaëtan Verhoosel (President), Gary B Born (appointed by claimant), Raúl E Vinuesa (appointed by respondent)
Mobil Investments Canada, Inc v. Canada (II), ICSID Case No. ARB/15/6 Notice of Intent submitted on 16 October 2014 In 2012, a NAFTA tribunal (see above) ruled that Canadian guidelines stipulating that energy companies active offshore invest a certain percentage of their revenue in R&D within Newfoundland and Labrador are NAFTA-inconsistent performance requirements. Since the R&D guidelines remain in effect, Mobil is seeking ongoing damages for the period 2012 to 2014. Damages sought: C$20 million. This case has been settled. The Notice of Arbitration was submitted on 16 January 2015. A hearing on jurisdiction, merits and quantum was held from 24–28 July 2017. On 13 July 2018, the tribunal issued a decision on jurisdiction and admissibility, holding that the tribunal has jurisdiction and the claims are admissible. A decision on scope of damages phase was issued on 11 December 2018. On 5 March 2019, the tribunal issued Procedural Order No. 10 concerning the schedule for the next phase of the proceeding. On 17 September 2019, the proceeding was suspended until 15 November 2019 pursuant to the parties' agreement. The parties reached an agreement to settle the dispute on 7 January 2020 and on 4 February 2020 the tribunal rendered its award embodying the settlement agreement. Arbitration rules: ICSID Convention Arbitration RulesAdministering institution: ICSIDArbitral tribunal: Christopher Greenwood (President), J William Rowley (appointed by claimant), Gavan Griffith (appointed by respondent)
Murphy Oil Corporation v. Canada (II) Notice of Intent submitted on 16 October 2014 In 2012, a NAFTA tribunal ruled that Canadian guidelines stipulating that energy companies active offshore invest a certain percentage of their revenue in research and development within Newfoundland and Labrador are NAFTA-inconsistent performance requirements. Since the R&D guidelines remain in effect, Murphy is seeking ongoing damages for the period 2012 to 2014. Damages sought: C$5 million. This case is pending. The Notice of Arbitration was submitted on 16 January 2015. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Lion Mexico Consolidated (LMC) v. Mexico, ICSID Case No. ARB(AF)/15/2 Notice of Intent submitted on 6 August 2015 Canadian real estate investment firm disputes the cancellation by Mexican courts of mortgages on three properties that secured loans provided by LMC to Mexican nationals. LMC alleges that its Mexican counterparties forged key legal documents and the Mexican courts have not provided their firm a fair opportunity to dispute this fraud and recover its investments. Damages sought: US$200 million. This case is pending. The Notice of Arbitration submitted on 11 December 2015. On 24 August 2016, Mexico filed a preliminary objection on jurisdiction. It was dismissed on 12 December 2016. A hearing on jurisdiction was held from 22–23 March 2018. A decision on jurisdiction was issued on 30 July 2018. The respondent filed a counter-memorial on the merits on 26 October 2018 and the tribunal issued a procedural order concerning production of documents on 3 January 2019. The US filed a non-disputing party submission on 21 June 2019. The tribunal held a hearing on the merits from 22 to 24 July 2019. On 1 October 2019, each party filed post-hearing briefs and on 22 October 2019, each party filed a statement of costs. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Juan Fernández-Armesto (President), David J A Cairns (appointed by claimant), Laurence Boisson De Chazournes (appointed by respondent), Ricardo Ramírez Hernández (appointed by respondent) (replaced), Vincente Corta Fernandez (appointed by respondent) (replaced)
CEN Biotech Inc v. Canada Notice of Intent submitted on 1 September 2015 Allegations that Canada breached NAFTA's non-discrimination and minimum standard of treatment provisions when Health Canada denied CEN Biotech Inc a licence. The company has been the object of numerous allegations of public misrepresentation and insider trading. Damages sought: US$4.5 billion. This case is pending, but the Notice of Arbitration has not yet been submitted. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Resolute Forest Products Inc v. Canada, PCA Case No. 2016-13 (UNCITRAL) Notice of Intent submitted on 30 September 2015 The US supercalendered paper producer alleged that provincial government financial assistance to a competing mill in Nova Scotia discriminated against Resolute, resulted in unfair competition and provoked US trade remedy action, which ultimately led to the closure of one of Resolute's Quebec mills. Damages sought: US$70 million. Notice of Arbitration submitted on 30 December 2015. Statement of Defence submitted on 1 September 2016. The tribunal held jurisdictional hearings in August 2017. A decision on jurisdiction and admissibility was made on 30 January 2018, holding that the tribunal has jurisdiction and claims are admissible, although certain claims dating prior to September 2012 were dismissed by the tribunal. Damages claimed are between US$163–201 million. Claimants submitted a memorial on 28 December 2018. Revised procedural timetables were adopted in February and November 2019. Canada submitted a Rejoinder Memorial on 4 March 2020. On 9 July 2019, the tribunal issued its decision on document production. On 1 April 2020, the tribunal extended the date for amici curiae and non-disputing party submissions to 24 April 2020. This case is pending. Canada filed related proceedings at the WTO to contest trade measures brought by the US. The US alleged the bailout of the mill breached international trade law. The WTO found partially in favour of Canada, which Canada appealed. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: James R Crawford (President), Ronald A Cass (appointed by claimant), Céline Lévesque (appointed by respondent)
TransCanada Corp & TransCanada Pipelines Ltd v. US, ICSID Case No. ARB/16/21 Notice of Intent submitted on 6 January 2016 Canadian energy company alleged that the delay and eventual rejection by the Obama administration of the Keystone XL pipeline discriminated against the company, denied it fair and equitable treatment and expropriated its investment. After the Trump administration approved the controversial project, the investor and the US government agreed to discontinue the NAFTA claim. Damages sought: US$15 billion. This case is discontinued by request of the parties. Notice of Arbitration submitted on 24 June 2016. On 24 March 2017, at the request of the parties, the ICSID Secretary-General formally discontinued the arbitral proceeding. On 8 November 2018, in response to a lawsuit brought by environmental and Native American tribes and groups against the US Department of State and TransCanada, a federal court in Montana ordered a pause in the construction of the Keystone XL pipeline. A number of lawsuits are pending in US courts. On 20 January 2021, President Biden formally revoked the permit needed to build the Keystone XL pipeline. It has been reported that the investor is considering its legal options, including a potential legacy NAFTA claim. Arbitration rules: ICSID Convention Arbitration RulesAdministering institution: ICSIDArbitral tribunal: David R Haigh (appointed by claimant), Sean D Murphy (appointed by respondent)
Mr Joshua Dean Nelson and Mr Jorge Blanco v. Mexico, ICSID Case No. UNCT/17/1 Notice of Intent submitted on 21 April 2016 Allegations that Mexican Federal Institute of Telecommunications' acts of failing to enforce Resolution 381, issuing subsequent Decree 77 and Resolution 127, which illegally reversed Resolution 381, irreparably harmed the investors' interests in Mexico and violated Mexico's obligation under NAFTA Articles 1110 1105 and 1102. Damages sought: approximately US$500 million. Notice of Arbitration submitted on 26 September 2016. The tribunal was constituted on 1 May 2017. Claimants filed a Statement of Claim on 7 November 2017. Respondent submitted a Statement of Defence on 13 March 2018, Claimants submitted a reply on the merits on 5 June 2018 and respondent submitted a rejoinder on merits issues on 10 September 2018. The parties submitted their memorials regarding jurisdiction during 2019 and each party filed their statement of cost on 15 January 2020. On 8 March 2020, Mr Veeder, the arbitrator appointed by the claimant, passed away. The remaining arbitrators invited the Parties to hold a conference call to discuss the next steps in the proceeding, which was held on 20 March 2020. However, because Mr Veeder had approved the circulated award as drafted on 3 March 2020, the tribunal issued the award on 5 June 2020 denying respondent's objection to jurisdiction, and also denying claimant's claim of unlawful expropriation and of unfair and inequitable treatment. The tribunal also ordered the claimant to pay over US$2 million to the respondent for its arbitration costs, including 80% of respondent's legal costs and fees. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Eduardo Zuleta (President), V V Veeder (appointed by claimant), Mariano Gomezperalta (appointed by respondent)
Primero Mining Corp v. Mexico Notice of Intent submitted on 2 June 2016 The investor alleged that actions taken by Mexican tax authority, which were intended to revoke investor's previously granted legal rights, were unfair, inequitable and discriminatory, and therefore violated Mexico's NAFTA obligations. The amount of damages in dispute has not been quantified. Notice of Arbitration has not been submitted to date. Claim is inactive. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Vento Motorcycles, Inc v. Mexico, ICSID Case No. ARB(AF)/17/3 Notice of Intent submitted on 20 February 2017 Vento assembles motorcycles in the US for export to Mexico. Its vehicles are now subject to a 30% import duty. The company asserted its Mexican-owned competitors, whose assembly practices are allegedly similar, do not pay such a duty, resulting in discrimination against Vento. The amount of damages claimed by the investor is unavailable. This case is pending. Notice of Arbitration submitted on 7 August 2017 (partially published). The respondent filed a counter-memorial on the merits and a memorial on jurisdiction on 12 November 2018. The tribunal issued a procedural order on document production issues on 25 January 2019. On 9 October 2019, the tribunal issued a procedural order concerning the organisation of the hearing. In November 2019, the tribunal held a hearing on jurisdiction and merits. On 2 July 2020, the tribunal issued an award dismissing the objections to admissibility, rejecting certain jurisdictional objections, but granting jurisdictional objections that there was no investment and declaring that respondent did not breach its obligations under NAFTA and dismissing the claims on the merits. The tribunal also ordered claimant to pay 50% of the respondent's legal fees and expenses (in an amount of nearly US$1 million) and 60% of the respondent's arbitration costs. Arbitration rules: ICSID Additional Facility RulesAdministering institution: ICSIDArbitral tribunal: Andrés Rigo Sureda (President), David A Gantz (appointed by claimant), Hugo Perezcano Diaz (appointed by respondent)
Tennant Energy, LLC v. Canada, PCA Case No. 2018-54 Notice of Intent submitted on 2 March 2017 US-owned energy company alleged that it was treated unfairly by Ontario authorities administering the province's FIT programme. Damages sought: C$116 million. The case is pending. Notice of Arbitration was submitted on 1 June 2017. The tribunal was established on 9 November 2018. Canada filed its Statement of Defense on 2 July 2019. The tribunal held a hearing on bifurcation, third-party funding, interim measures and security for costs on 14 and 15 January 2020. On 27 February 2020, the tribunal issued Procedural Order No. 4, rejecting Tennant's request for interim measures. The tribunal also declared Canada's bifurcation request 'premature', leaving open the option for Canada to renew its request. The tribunal also ordered Tennant to make certain disclosures regarding any third-party funding it may have received, but denied Canada's request for security for costs. The written submission phase is continuing with certain deadlines extended (at least in part) because of the covid-19 pandemic. Arbitration rules: UNCITRALAdministering institution: PCAArbitral tribunal: Mr Cavinder Bull SC (Presiding Arbitrator) Mr Doak Bishop Sir Daniel Bethlehem QC
Omnitrax Enterprises Inc v. Canada Notice of Intent submitted on 14 November 2017 Allegations that the Manitoba government's decision not to approve the company's proposals to transport oil by rail for export from Churchill further undermined its investment. Damages sought: C$150 million. This case is pending. But the Notice of Arbitration has not yet been submitted. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Dal Tile Corporation (DTC) and Dal Tile Internacional (DTI) v. Mexico Notice of Intent submitted on 1 February 2018 DTC and DTI are US companies that own 49.99% of Recubrimientos Interceramic, S.A. de C.V. These US companies started a private arbitration in 2016 and allege that Mexico took steps to stop the private arbitration, affecting their rights under NAFTA. This case is pending. The Notice of Arbitration has not yet been submitted. N/A
Alicia Grace and others v. Mexico, ICSID Case No. UNCT/18/4 Registered at ICSID on 19 June 2018 Twenty-seven US investors in a petroleum services venture brought claims relating to oil exploration and production equipment against Mexico. Tribunal was constituted on 25 January 2019. Request for Arbitration submitted on 19 June 2018. Claimant filed a Statement of Claim on 7 October 2019 and Mexico filed a response to claimants' request for provisional measures 7 days later. On 19 December 2019, the tribunal issued Procedural Order No. 6 concerning provisional measures. On 11 November 2020, the tribunal issued Procedural Order No. 9 concerning production of documents. This case is pending. Arbitration rules: UNCITRALAdministering institution: ICSIDArbitral tribunal: Diego P Fernández Arroyo (President), Andrés Jana Linetzky (appointed by claimant), Gabriel Bottini (appointed by respondent)
Westmoreland Coal Company v. Canada Notice of Intent submitted on 20 August 2018 A US entity purchased mine-mouth coal operations adjacent to a coal-fired power station. In 2015, Canada changed its regulations, deciding to phase out coal-fired power by 2030. The investor alleged that Canadian companies were compensated for this change in an amount of over US$1.4 billion, but Westmoreland was excluded from the compensation, which it claims is tantamount to expropriation and violation of the minimum standard of treatment. Damages sought: C$470 million Notice of Arbitration and statement of claim were submitted on 19 November 2018. An updated version was submitted in August 2019 by Westmoreland's successor entity. Westmoreland entered Chapter 11 bankruptcy proceedings in 2018, shortly before it commenced the arbitration. In September 2020, a remote hearing on bifurcation took place. In its Procedural Order No. 3 issued on 20 October 2020, the tribunal partially bifurcated one of Canada's three preliminary objections from the merits of the dispute. On 18 December 2020, the respondent filed a memorial on jurisdiction and admissibility. On 26 February 2021, the claimant filed a counter-memorial on jurisdiction. This case is pending. Arbitration rules: UNCITRALAdministering institution: N/AArbitral tribunal: Juliet Blanch (President), James Hosking (appointed by claimant), Zachary Douglas QC (appointed by respondent)
Legacy Vulcan, LLC v. Mexico, ICSID Case No. ARB/19/1 Notice of Intent submitted on 3 September 2018 US investor brought claims against Mexico relating to limestone extraction and exportation. Damages sought reportedly are approximately US$500 million. This claim was registered in ICSID on 3 January 2019. On 20 September 2019, the tribunal was constituted in accordance with Article 37(2) of the ICSID Convention and issued Procedural Order No. 1 on 26 November 2019 concerning procedural matters. On 22 February 2021, the claimant filed a reply on the merits This case is pending. Arbitration rules: ICSID Convention Arbitration RulesAdministering institution: ICSIDArbitral tribunal: Albert Jan Van Den Berg (President), Guido Santiago Tawil (appointed by claimant), Sergio Puig (appointed by respondent)
Odyssey Marine Exploration v. Mexico, ICSID Case No. UNCT/20/1 Notice of Intent submitted on 4 January 2019 US marine and development company alleged Mexico breached its NAFTA obligations and minimum standard of treatment, and national treatment by refusing to grant environmental permits for the exploration of large phosphate deposit located off the coast of Baja, California. Damages sought: more than US$3.5 billion. Notice of arbitration filed on 5 April 2019. The first session of the tribunal was held on 17 April 2020 and the tribunal issued its Procedural Order No. 1 on 23 April 2020, which included a procedural timetable (which was revised as of 12 January 2021). Disclosure and the written phase is ongoing with a hearing on jurisdiction and liability planned for January 2022. The Respondent filed a counter-memorial on 23 February 2021. This case is pending. Arbitration rules: 16/UNCITRALAdministering institution: ICSIDArbitral tribunal: Felipe Bulnes Serrano (President), Stanimir A. Alexandrov (appointed by claimant) Philippe SANDS (appointed by respondent)
Renaud Jacquet et al v. Mexico Notice of Intent submitted on 17 January 2019 Investors from France, Canada and Portugal filed claims regarding several beachfront parcels in Tulum, Mexico on which they have hotels. Claimants allege, among other things, expropriation and breach of fair and equitable treatment standards under NAFTA, the France–Mexico BIT and the Mexico–Portugal BIT. Damages sought: US$70 million. This case is pending. Arbitration rules: N/A Administering institution: N/AArbitral tribunal: Not constituted
Jonathan Levy v. Canada Notice of Intent submitted on 16 February 2019 US investor claimed that the Alberta Securities Commission ignored his rights as a cross-border legal service provider and treated him as a layperson to allegedly circumvent the attorney–client privilege. He also alleged discriminatory treatment. Damages sought: at least US$2 million in alleged lost investments and billings. This case is pending. Arbitration rules: N/A Administering institution: N/AArbitral tribunal: Not constituted
L1bero Partners LP and Other v. Mexico Notice of Intent submitted on 29 March 2019 L1bero Partners LP (Canadian company), Espiritu Santo Technologies LLC (US company) and LIBRE Holding LLC (US company) claimthat the Mexican government unilaterally modified the terms of a 10-year concession for the replacement, installation and maintenance of taximeters in Mexico City. This case is pending. Espiritu Santo Holdings LP, a Texan company, and L1bero Partners LP jointly control the Mexican subsidiary called Lusad. Lusad is the company that received the 10-year concession from the Mexican government. Espiritu Santo Holdings LP accused L1bero Partners LP and Espiritu Santo Technologies LLC of trying to seize full control of Lusad. These companies are working through an ICC arbitration for alleged breaches of the partnership agreement. In May 2019, a New York federal court barred L1bero Partners LP from trying to oust Espiritu Santo Holdings LP from Lusad, a decision that was reaffirmed by the Second Circuit on 10 January 2020. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Geophysical Service, Inc et al. v. Canada Notice of Intent submitted on 18 April 2019 Three US nationals who invested in a Canadian company specialising in collecting marine seismic data for offshore oil and gas operations claim Canada unlawfully confiscated their proprietary information.Damages sought: US$2.5 billion, plus interest and costs. This case is pending. Arbitration rules: N/AAdministering institution: N/AArbitral tribunal: Not constituted
Espiritu Santo Holdings, LP (ES Holdings) v. Mexico, ICSID Case No. ARB/20/13 Notice of Intent submitted on 30 May 2019 Canadian investor claims a de facto termination of a 10-year concession for the replacement, installation and maintenance of taximeters in Mexico City. The investor further claims the expropriation of its investment and a fraudulent attemptto change the concession provisions. ICSID registered a request for institution of proceedings on 11 May 2020. The tribunal was constituted on 27 January 2021 and a first session was held by video conference on 11 March 2021. This case is pending. Arbitration rules: ICSIDAdministering institution: N/AArbitral tribunal: Eduardo Zuleta Jaramillo (President), (appointed by agreement of the parties); Charles Poncet (appointed by claimant); and Raúl Emilio Vinuesa (appointed by respondent)
Carlos Sastre and others v. Mexico, ICSID Case No. UNCT/20/2 Notice of Intent submitted on 17 January 2019 Mr Sastre, along with a group of French, Canadian and Portuguese investors has argued that Mexico violated a number of provisions of NAFTA, the France–Mexico BIT, the Portugal–Mexico BIT and the Argentina–Mexico BIT by seizing several eco-tourism hotel facilities in the city of Tulum. The tribunal held a first session by video conference on 26 May 2020 and issued its Procedural Order No. 1 on 28 May 2020. The tribunal bifurcated jurisdiction and merits issues and the respondent filed its memorial on jurisdiction on 23 December 2020. A hearing on jurisdictional objections (if necessary) is expected in early 2022. This case is pending. Arbitration rules: rules: UNCITRALAdministering institution: ICSID is administering the arbitrationArbitral tribunal: Eduardo Zuleta (President), Charles Poncet(appointed by claimants), Christer Soderlund (appointed by respondent)
First Majestic Silver Corp. v. Mexico Notice of Intent submitted on 13 May 2020 First Majestic is a company focused on silver production in Mexico and has alleged on its own behalf and on behalf of its subsidiary that Mexico's tax authority has acted contrary to an alleged advance pricing agreement relating to payment of taxes of the investor for 2010–2014. Additionally, the investor has alleged that Mexico acted contrary to three double-taxation treaties. Although the investor reported in a 2 March 2021 press release that it submitted its request for arbitration to ICSID, the case has not yet been registered on the ICSID website as of 14 March 2021. Presumably the claim was filed under USMCA's provision for legacy NAFTA claims. Arbitration rules: N/AAdministering institution: ICSIDArbitral tribunal: Not constituted
Koch Industries, Inc. and Koch Supply & Trading, LP v. Canada, ICSID Case No. ARB/20/52 Case registered by ICSID on 17 December 2020 US-based conglomerate, Koch Industries and Koch Supply & Trading, have initiated arbitration proceedings against Canada, invoking NAFTA. The dispute reportedly arises as a result of a trading programme relating to emissions rights/allowances, which was organised – and subsequently cancelled – by the Canadian Province of Ontario. ICSID registered the case on 17 December 2020, Mr Alvarez accepted appointment as arbitrator on 4 January 2021 and Prof. Bjorklund accepted her appointment as arbitrator on 13 January 2021. This case is pending. Arbitration rules: ICSID ConventionAdministering institution: ICSID Arbitral tribunal: Henri Alvarez (appointed by claimants), Professor Andrea Bjorklund (appointed by respondent)