A report has been prepared to assess the feasibility of introducing district heating networks in Swansea. District heating involves the provision of heat in the form of hot water or steam from a central source to various locations through a network of underground pipes. The report suggested that underground pipe connections would cost an estimated £1m but this could be recovered through lower energy bills within 13 years.