The proposed development consists of at least one solar power generation plant with 200MW capacity and would be a combination of concentrated solar power and photovoltaic technologies.

The venture will be procured as an Independent Power Project (IPP) utilising a similar structure to that used in Oman for the conventional gas based power projects. Two potential locations have been chosen in the Adam and Manah areas in the Dakhiliyah Governorate.

The project and the collection of solar radiation data from the sites is being overseen by Oman Power and Water Procurement Company (OPWPC), which is also the offtaker for all electricity in Oman.